We got the Q2 Australian ‘Construction Work Done’ report earlier
It came in at a big beat on expectations at +1.6% q/q (vs. -1.5% expected)
And the highest since 2013 Q3
We got the Q2 Australian ‘Construction Work Done’ report earlier
It came in at a big beat on expectations at +1.6% q/q (vs. -1.5% expected)
And the highest since 2013 Q3