Big miss for July construction PMI at 51.9
– Prior was 54.8
Cable rallied 50 pips from daily lows into the number.
This is the lowest reading since September 2016 and is very close to entering into contractionary territory.
Big miss for July construction PMI at 51.9
– Prior was 54.8
Cable rallied 50 pips from daily lows into the number.
This is the lowest reading since September 2016 and is very close to entering into contractionary territory.