Construction data from Australia:
– Prior was 50.8
– Two months ago was at 45.2
This looks like a terrible headline but it’s a volatile index and jumped last month. This is still the second-best reading in 2016.
Construction data from Australia:
– Prior was 50.8
– Two months ago was at 45.2
This looks like a terrible headline but it’s a volatile index and jumped last month. This is still the second-best reading in 2016.